Saturday, January 20, 2007

Prosedur install Boiler

PROCEDURE FOR INSPECTION OF INSTALLED BOILERS


It is essential to have every part of the boiler, that is accessible, open and properly prepared for examination, internally and externally. All boilers have openings through which an examination may be made and which for operation are closed; all such parts shall be opened whether for access to water surfaces, or heater surfaces.

No comments:

Post a Comment

Terima kasih Atas Komentar Anda. Sebagai ucapan terimakasih kami cobalah bonus dari kami dengan klik web berikut : http://www.klik.ws/klik_dapatdollar
Terimakasih.